LintelConstruction

Sample projects

See it before we build

Every Lintel project starts as a design you can see. These sample projects show the kind of work we do, the scope involved and how long it typically takes on site. Images are design renders. Completed case studies, with the approved design shown next to the finished space, are added as projects are photographed.

Outdoor Kitchens

About this service
Outdoor kitchen under a timber and steel pavilion with a stone island, built-in grill and pendant lights at dusk

Pavilion kitchen

Sample project

Estate backyard, King Township

  • Steel and cedar pavilion with integrated lighting
  • Limestone-clad island with built-in grill and warming drawer
  • Pizza oven and vented hood
  • Natural gas line and pressure test by licensed gas fitter

Typical timeline: 6 weeks on site

Covered poolside outdoor kitchen and lounge with stainless appliances and warm evening lighting

Poolside cabana

Sample project

Poolside cabana, Oakville

  • Covered cabana with kitchen and lounge
  • Stainless outdoor cabinetry and refrigeration
  • Linear gas fireplace and infrared heaters
  • Porcelain pavers to match pool surround

Typical timeline: 7 weeks on site

Water Features and Fountains

About this service
Tiered limestone fountain in a formal stone courtyard with clipped boxwood hedges

Courtyard fountain

Sample project

Entry courtyard, Kleinburg

  • Tiered limestone fountain on frost-protected footing
  • Recirculating pump and filtration vault
  • Low-voltage uplighting on a timer
  • Seasonal Fountain Care plan

Typical timeline: 3 weeks on site

Illuminated sheer-descent water wall beside a reflecting pool and contemporary home at night

Water wall and reflecting pool

Sample project

Modern pool terrace, Caledon

  • Sheer-descent water wall in honed basalt
  • Reflecting edge with concealed overflow
  • Integrated LED wash lighting
  • Automated winterizing drain-down

Typical timeline: 4 weeks on site

Basement Renovations

About this service
Finished basement with walnut media wall, home theatre seating and a wet bar with stone counters

Media lounge and bar

Sample project

Lower level, Vaughan

  • Walnut media wall with concealed equipment
  • Acoustic ceiling and insulated walls
  • Wet bar with quartzite counters
  • Waterproofing and sump upgrade before finishing

Typical timeline: 11 weeks on site

Glass-walled, climate-controlled wine room with oak racks and warm accent lighting

Glass wine room

Sample project

Wine room, Mississauga

  • Glass-enclosed cellar with ducted cooling
  • Oak and steel display racking for 600 bottles
  • Porcelain stone floor
  • Tasting area with accent lighting

Typical timeline: 6 weeks on site

Kitchen Renovations

About this service
Kitchen with a large waterfall quartzite island, white oak cabinetry and panel-ready appliances

Quartzite island kitchen

Sample project

Family kitchen, Toronto

  • Waterfall quartzite island
  • White oak cabinetry with integrated panels
  • Load-bearing wall removal with engineered beam
  • Layered lighting on dimmers

Typical timeline: 9 weeks on site

Butler's pantry with custom cabinetry, marble backsplash, open shelving and a coffee station

Butler's pantry

Sample project

Butler's pantry, Richmond Hill

  • Full-height pantry cabinetry
  • Marble backsplash and open shelving
  • Coffee station with plumbed machine
  • Brass hardware and fireclay sink

Typical timeline: 4 weeks on site

Bathroom Renovations

About this service
Primary ensuite with curbless glass shower, freestanding soaking tub and large-format stone tile

Primary ensuite

Sample project

Primary ensuite, Burlington

  • Curbless shower with linear drain
  • Freestanding tub with floor-mounted filler
  • Heated floor on a programmable thermostat
  • Full waterproofing system, flood tested

Typical timeline: 5 weeks on site

Powder room with a floating natural stone vanity, vessel sink and backlit mirror

Powder room

Sample project

Powder room, Markham

  • Floating natural stone vanity
  • Wall-mounted faucet and vessel sink
  • Backlit mirror and pendant lighting
  • Textured plaster walls

Typical timeline: 2 weeks on site

Start here

Book a design consultation

Tell us a little about your project. We will call within one business day to arrange a site visit, then show you a design in 3D and a fixed price before anything is built.

Prefer to read first? See how we work.

We reply within one business day. No obligation.

Get a fixed-price quote